How to Restoration a Fabric Covering on a Piper Super Cub J-3

8 steps 40 min Intermediate

How to learn about Restoration a Fabric Covering on a Piper Super Cub J-3 by the following 8 steps: Step 1: Remove Old Fabric and Assess Structure. Step 2: Prepare Structure and Install Fabric Attachment Points. Step 3: Cut and Fit Fabric Patterns. Step 4: Apply Fabric to Wing Structure. Step 5: Shrink Fabric and Perform Rib Stitching. Step 6: Apply Finishing Tapes and Reinforcement. Step 7: Apply Primer and Base Coats. Step 8: Complete Final Finishing and Quality Inspection.

Your Progress

0 of 8 steps completed

Step-by-Step Instructions

1

Step 1: Remove Old Fabric and Assess Structure

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Carefully strip existing fabric covering and thoroughly inspect underlying structure for damage, corrosion, or needed repairs before beginning new fabric installation. Example: Begin fabric removal by cutting along rib stitch lines and seams using sharp fabric knife, working systematically from wing tips toward wing roots to avoid damaging underlying structure, photograph existing fabric attachment methods and tape placement for reference during reinstallation process, remove all old fabric adhesive and dope residue from wing ribs and spars using appropriate solvents and scraping tools, inspect all wood structure for cracks, rot, or insect damage particularly at rib attachment points and spar joints, examine metal fittings for corrosion, cracking, or loose attachment hardware that might need repair or replacement, check fabric attachment points including grommets, drain holes, and inspection covers for proper condition and alignment, document any structural repairs needed and coordinate with appropriate specialists before proceeding with fabric installation, and clean all surfaces thoroughly to ensure proper adhesion of new fabric covering system.

Discussion for this step

Sign in to comment

Loading comments...

2

Step 2: Prepare Structure and Install Fabric Attachment Points

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Complete all structural repairs and install necessary fabric attachment hardware before beginning fabric installation process. Example: Sand and refinish any wood components requiring repair using appropriate aircraft-grade materials and finishes, install rib bracing tape on all sharp edges and corners where fabric will contact structure to prevent chafing and wear, apply fabric cement to rib caps and attachment points according to manufacturer specifications for chosen fabric system, install grommets and reinforcement patches at drain holes, inspection openings, and control surface attachment points, mark rib stitch hole locations using proper spacing (typically 3-4 inches on center) and drill pilot holes for stitching needles, apply protective tape or edge treatment to all metal edges that will contact fabric during installation process, verify proper fit and operation of control surfaces before fabric installation to avoid interference issues, prepare fabric adhesive and primer materials according to temperature and humidity requirements specified in covering system manual, and organize workspace with adequate lighting, ventilation, and temperature control for fabric covering operations.

Discussion for this step

Sign in to comment

Loading comments...

3

Step 3: Cut and Fit Fabric Patterns

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Measure wing and fuselage surfaces and cut fabric pieces with proper allowances for shrinkage and attachment methods. Example: Measure each wing panel individually accounting for chord length, span, and any wing twist or dihedral that affects fabric pattern, add 4-6 inch overlap allowance on all edges for proper attachment and trimming during installation process, create paper templates for complex areas like wing tips, control surface cutouts, and fuselage curves to ensure accurate fabric cutting, mark fabric grain direction and maintain consistent orientation throughout aircraft to prevent uneven shrinkage patterns, cut fabric using sharp scissors or rotary cutter to prevent fraying and ensure clean edges for professional appearance, label each fabric piece with its intended location and orientation to prevent confusion during installation process, test fit fabric pieces on structure before applying adhesive to verify proper dimensions and alignment, plan fabric seam locations to minimize stress concentrations and provide access for inspection and maintenance, and store cut fabric pieces in clean, protected environment to prevent contamination before installation.

Discussion for this step

Sign in to comment

Loading comments...

Ceconite Fabric

Grade A aircraft fabric in 72-inch width for covering wings and fuselage - provides superior strength and longevity compared to cotton fabric.

$12.5
4

Step 4: Apply Fabric to Wing Structure

Install fabric covering on wing surfaces using proper adhesive techniques and achieving correct fabric orientation and tension. Example: Begin fabric installation at wing root working toward wing tip to maintain proper fabric grain alignment and minimize wrinkles, apply fabric cement to wing leading edge and attach fabric with slight tension while maintaining straight grain orientation, work fabric around wing tip using heat and moisture to conform to compound curves without creating excessive stress concentrations, secure fabric at trailing edge using appropriate attachment method (cement, screws, or rib stitching) according to aircraft type and covering system, eliminate wrinkles and air bubbles by working fabric smooth while adhesive is still workable, trim excess fabric leaving appropriate overlap for final edge finishing and inspection access, check fabric tension using appropriate gauge or visual inspection to ensure uniform tautness without over-stressing structure, apply temporary hold-down devices as needed to maintain fabric position during curing process, and allow proper cure time before proceeding with shrinking operations according to manufacturer recommendations.

Discussion for this step

Sign in to comment

Loading comments...

Work Platform

Adjustable height work platform for accessing wing surfaces during fabric installation - provides stable work surface at proper height.

$325
5

Step 5: Shrink Fabric and Perform Rib Stitching

Heat shrink fabric to proper tension and secure to wing ribs using traditional rib stitching techniques for structural attachment. Example: Set fabric iron to proper temperature (typically 225-250°F) using calibrated thermometer to ensure accurate heat application, begin shrinking process at center of each panel working outward to edges to maintain even tension distribution, apply heat in overlapping passes maintaining consistent iron speed and pressure to prevent over-heating or uneven shrinkage, monitor fabric tension during shrinking process using visual inspection and tension gauge to achieve proper tautness without over-stressing, mark rib stitch locations using chalk line or template ensuring consistent spacing and alignment with rib centerlines, begin rib stitching at wing root using curved needles and appropriate thread (linen or synthetic) with proper knot techniques, maintain consistent stitch tension and spacing (typically 3-4 inches apart) for structural integrity and professional appearance, tie off stitches using aviation-approved knot techniques that will not loosen under load or vibration, and inspect completed stitching for proper tension and security before proceeding with tape application.

Discussion for this step

Sign in to comment

Loading comments...

Fabric Covering Iron

Digital temperature-controlled fabric iron for precise heat shrinking of aircraft fabric - essential for achieving proper fabric tension without overheating.

$285
Rib Stitching Needle

Curved stitching needles for securing fabric to wing ribs - creates professional hand-stitched appearance and structural attachment.

$25.99
6

Step 6: Apply Finishing Tapes and Reinforcement

Install fabric tapes over rib stitch lines and structural joints to provide smooth finish and additional reinforcement. Example: Cut finishing tape to proper lengths allowing slight overlap at ends to prevent tape separation under load, apply fabric cement to tape and underlying fabric according to manufacturer specifications for proper adhesion, position tape centered over rib stitch lines ensuring straight alignment and consistent overlap on both sides, smooth tape during application to eliminate air bubbles and wrinkles that could affect appearance or durability, apply additional reinforcement tape at high-stress areas including control surface hinges, landing gear attachments, and inspection openings, trim tape ends with sharp scissors to prevent fraying and maintain professional appearance, apply tape to wing leading and trailing edges using proper techniques for compound curves and stress distribution, install drain grommets and inspection covers with appropriate reinforcement and sealing, and inspect all tape applications for proper adhesion and smooth finish before proceeding with coating application.

Discussion for this step

Sign in to comment

Loading comments...

Fabric Scissors

Professional fabric cutting shears for precise trimming and pattern cutting - sharp blades prevent fabric fraying during installation.

$45.99
Finishing Tape

Pre-shrunk fabric tape for covering rib stitch lines and seams - provides smooth finished appearance and additional reinforcement.

$8.5
7

Step 7: Apply Primer and Base Coats

Spray primer and base coat materials to seal fabric and provide foundation for final color coats using proper spray techniques. Example: Set up spray booth or ventilated area with proper lighting and temperature control for coating application, thin primer materials according to manufacturer specifications considering temperature and humidity conditions, apply first coat of fabric primer using cross-coat spray pattern with 50% overlap between passes, allow proper flash time between coats (typically 15-30 minutes) before applying subsequent coats to prevent solvent entrapment, sand lightly between coats using fine sandpaper (320-400 grit) to smooth any imperfections and provide adhesion for next coat, apply additional primer coats as needed to achieve uniform coverage and smooth surface finish, mask areas not to be painted including control surface gaps, inspection covers, and hardware using appropriate tape and paper, apply base coat using same spray techniques maintaining consistent mil thickness and avoiding runs or sags, inspect each coat for proper coverage, color uniformity, and surface smoothness before proceeding to next application, and document coating system and application data for maintenance records and warranty purposes.

Discussion for this step

Sign in to comment

Loading comments...

Poly-Fiber Kit

Complete fabric covering system including adhesive, primer, and topcoat materials - simplified process with excellent durability and finish quality.

$450
8

Step 8: Complete Final Finishing and Quality Inspection

Apply final color coats and perform comprehensive quality inspection of completed fabric covering installation. Example: Apply final color coats using proper spray technique and maintaining consistent film thickness throughout aircraft, wet sand between color coats using 600-800 grit paper to achieve smooth professional finish, polish final coat to desired gloss level using appropriate compounds and techniques for chosen coating system, install all hardware including inspection covers, grommets, and control surface attachments with proper torque specifications, perform comprehensive inspection of fabric installation checking for proper tension, secure attachment, and absence of wrinkles or defects, test control surface operation ensuring full travel without fabric interference or binding conditions, document fabric covering completion including materials used, application dates, and any deviations from standard procedures, conduct final weighing of aircraft to determine any change in weight and balance from fabric covering process, update aircraft maintenance records with fabric covering documentation and compliance with applicable regulations, and coordinate with appropriate inspection authority for return to service approval and airworthiness certification.

Discussion for this step

Sign in to comment

Loading comments...

Fabric Tension Meter

Digital cable tension meter for measuring fabric tautness and control cable tensions - ensures proper installation per manufacturer specifications.

Paint Spray Gun

HVLP spray gun specifically designed for fabric coating application - provides even coverage of dope and topcoat finishes.