How to Glacier Ice Core Drilling
How to learn about Glacier Ice Core Drilling by the following 7 steps: Step 1: Plan Drilling Site Selection and Obtain Permits. Step 2: Assemble and Transport Ice Drilling Equipment. Step 3: Establish Safe Drilling Platform on Glacier Surface. Step 4: Configure and Calibrate Ice Drilling System. Step 5: Execute Controlled Ice Core Drilling Operations. Step 6: Process and Document Ice Core Samples. Step 7: Secure Sample Storage and Transport Logistics.
Your Progress
0 of 7 steps completedStep-by-Step Instructions
1 Step 1: Plan Drilling Site Selection and Obtain Permits
Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."
Step 1: Plan Drilling Site Selection and Obtain Permits
Identify optimal drilling locations based on scientific objectives and obtain necessary permits for glacier access and ice core extraction. Example: Research historical glacier data and satellite imagery to identify areas with minimal crevassing and maximum ice thickness for your research depth requirements, contact relevant land management agencies such as National Park Service, Forest Service, or international authorities for drilling permits which can take 6-12 months to process, coordinate with local guides or glacier experts familiar with current ice conditions, seasonal access routes, and safety considerations, develop detailed site maps showing GPS coordinates, elevation profiles, and backup drilling locations in case primary sites are inaccessible, establish research protocols meeting institutional review board requirements and environmental impact assessments, plan drilling schedule considering optimal weather windows typically during late spring or early summer months, coordinate with other research teams to avoid conflicts and share logistical resources, and prepare detailed safety protocols including crevasse rescue procedures, medical evacuation plans, and emergency communication systems for remote glacier locations.
Garmin inReach Explorer+
Satellite communicator with GPS navigation for emergency communication and location tracking in remote glacier locations.
2 Step 2: Assemble and Transport Ice Drilling Equipment
Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."
Step 2: Assemble and Transport Ice Drilling Equipment
Carefully pack and transport specialized ice drilling equipment to the glacier site while protecting sensitive components from damage during transit. Example: Disassemble drilling system into transportable components ensuring all drill bits, motor assemblies, and electronic components are properly secured and protected from shock, pack equipment in heavy-duty waterproof cases with custom foam inserts to prevent movement and impact damage during helicopter or ground transport, prepare complete inventory checklist including spare parts such as extra drill bits, replacement cables, backup power sources, and emergency repair materials, coordinate transport logistics with helicopter operators or ground vehicles capable of accessing remote glacier sites with heavy equipment loads, test all electronic components and battery systems before departure ensuring full charges and backup power sources are available, pack drilling fluids, lubricants, and antifreeze solutions in appropriate containers meeting transportation safety regulations, organize tool kits with metric and standard tools needed for equipment assembly and maintenance in field conditions, and establish equipment staging area at base camp with weather protection and organized layout for efficient drilling operation setup.
PICO Lightweight Ice Coring System
Portable hand-operated ice coring system capable of drilling to 15 meters depth, specifically designed for shallow glacier research.
Pelican Storm iM3075 Hard Case
Ultra-durable waterproof case for transporting ice core drilling equipment in extreme conditions.
3 Step 3: Establish Safe Drilling Platform on Glacier Surface
Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."
Step 3: Establish Safe Drilling Platform on Glacier Surface
Create a stable and secure drilling platform while ensuring safety protocols are in place for glacier travel and crevasse hazards. Example: Rope up team members with appropriate glacier travel techniques using dynamic climbing ropes, harnesses, and crevasse rescue equipment before approaching drilling sites, probe drilling area thoroughly with avalanche probes to detect hidden crevasses within 50-meter radius of planned drilling location, establish snow anchors or deadman anchors to secure drilling equipment preventing loss into crevasses if platform fails, level drilling platform using snow shovels and compaction techniques creating stable base minimum 3 meters square for equipment setup, set up windscreens and weather protection around drilling area to protect equipment and operators from harsh glacier conditions, install safety perimeter markers and warning flags to identify hazardous areas and safe zones for team movement, establish communication protocols with base camp including regular check-in schedules and emergency signal procedures, deploy ground-penetrating radar if available to assess ice thickness and internal glacier structure before drilling operations begin, and create detailed site documentation including GPS coordinates, elevation, ice surface conditions, and photographic records for scientific documentation.
Brunton Geo Transit Compass
Professional geological compass for precise site positioning and orientation measurements on glaciers.
4 Step 4: Configure and Calibrate Ice Drilling System
Step 4: Configure and Calibrate Ice Drilling System
Assemble the ice drilling system components and perform calibration tests to ensure optimal performance in glacier ice conditions. Example: Assemble drilling mast and motor housing according to manufacturer specifications ensuring all connections are tight and properly aligned for vertical drilling, install appropriate drill bit size typically 3-4 inches diameter for standard ice core samples and verify cutting edges are sharp and properly set, connect power systems including generator, battery packs, or manual drive mechanisms testing all electrical connections and safety shutoffs, calibrate drilling depth measurement systems using mechanical or electronic depth counters ensuring accuracy within centimeter measurements, test drilling fluid circulation systems if using wet drilling methods to prevent drill bit overheating and core melting, perform initial drilling tests in nearby ice to verify system operation, core quality, and drilling speed typically 1-3 meters per hour depending on ice conditions, adjust drilling parameters including rotation speed, downward pressure, and advance rate based on ice hardness and density encountered, establish core recovery procedures ensuring continuous core sections without gaps or breaks, and prepare backup drilling components including spare drill bits, replacement parts, and alternative power sources in case of equipment failure during operations.
FELICS Deep Ice Drilling System
Fast electromechanical lightweight ice coring system for depths up to 300 meters with rapid core recovery.
5 Step 5: Execute Controlled Ice Core Drilling Operations
Step 5: Execute Controlled Ice Core Drilling Operations
Perform systematic ice core drilling maintaining consistent core quality while monitoring drilling parameters and safety conditions. Example: Begin drilling operations using steady downward pressure and consistent rotation speed avoiding excessive force that could fracture or melt ice cores, monitor drilling progress continuously checking for changes in ice density, hardness, or debris layers that may require parameter adjustments, maintain detailed drilling log recording depth intervals, drilling time, core recovery percentages, and any operational issues or equipment adjustments made, recover ice cores in manageable sections typically 1-3 meters long depending on drilling system capabilities and core storage requirements, inspect each core section immediately after recovery noting ice quality, bubble structure, debris layers, and any drilling-induced damage, measure and photograph each core section before storage creating visual record of core characteristics and stratigraphic features, clean drilling equipment between core runs removing ice chips and debris that could contaminate subsequent samples, adjust drilling techniques based on changing ice conditions such as varying between dry drilling in cold conditions and wet drilling in warmer ice, and maintain safe working conditions by monitoring weather changes, equipment performance, and team member condition during extended drilling operations that may continue for several days.
Kovacs Ice Coring System
Traditional mechanical ice auger system with various barrel lengths for shallow to medium depth ice sampling.
6 Step 6: Process and Document Ice Core Samples
Step 6: Process and Document Ice Core Samples
Carefully handle, document, and prepare ice core samples for transport while maintaining sample integrity and detailed records. Example: Handle ice cores with clean gloves and sterile techniques preventing contamination from handling, drilling fluids, or environmental sources, measure precise core dimensions including length, diameter, and weight creating detailed physical inventory of recovered samples, photograph each core section with measurement scale and sample identification labels creating visual documentation for laboratory reference, cut core samples into appropriate lengths for different analytical procedures using clean stainless steel saws or breaking techniques, package core samples in sterile containers or bags labeled with site location, depth interval, recovery date, and intended analysis procedures, create detailed chain of custody documentation tracking sample handling from recovery through laboratory delivery, record detailed core descriptions including ice crystal structure, bubble content, visible debris layers, and color variations that indicate different depositional periods, preserve samples at consistent sub-zero temperatures using dry ice or mechanical refrigeration preventing melting or sublimation during transport, and prepare sample shipping manifests meeting international shipping regulations for biological or geological samples including customs documentation and hazardous materials declarations.
Whirlpak Sterile Sampling Bags
Pre-sterilized polyethylene bags for contamination-free ice core sample collection and storage.
FieldBook Geological Field Notebook
Waterproof field notebook with grid pages for documenting drilling locations, core descriptions, and sampling conditions.
7 Step 7: Secure Sample Storage and Transport Logistics
Step 7: Secure Sample Storage and Transport Logistics
Maintain proper storage conditions and coordinate transport logistics to preserve ice core sample integrity during evacuation from glacier sites. Example: Pack ice core samples in insulated containers with sufficient dry ice or gel packs to maintain temperatures below -10°C throughout transport duration, organize samples in logical order matching drilling sequence and depth intervals for laboratory processing efficiency, coordinate helicopter or ground transport schedules considering weight limitations and weather windows for safe evacuation from glacier sites, prepare backup storage options including emergency cache locations in case transport delays occur due to weather or mechanical issues, establish temperature monitoring systems using data loggers to verify consistent storage temperatures throughout transport chain, coordinate with receiving laboratories confirming delivery schedules, storage capabilities, and any special handling requirements for your specific samples, prepare complete documentation packages including drilling logs, sample inventories, GPS coordinates, and analytical protocols traveling with samples, arrange customs clearance and international shipping permits if transporting samples across borders for analysis, plan redundant transport routes and backup logistics in case primary evacuation methods become unavailable due to changing conditions, and establish final sample verification procedures at receiving laboratory ensuring all samples arrived intact and properly preserved for intended analyses.
Engel 65 High Performance Cooler
Heavy-duty insulated cooler designed for maintaining ice core samples at sub-zero temperatures during transport.
Coleman Xtreme Marine Cooler
Basic insulated cooler for temporary ice core storage with UV-resistant exterior.