How to Traditional Lime Plaster Making

8 steps 40 min Intermediate

How to learn about Traditional Lime Plaster Making by the following 8 steps: Step 1: Source Quality Lime and Prepare Lime Putty. Step 2: Select and Prepare Aggregate Sand. Step 3: Add Fiber Reinforcement Materials. Step 4: Mix Lime Plaster in Proper Proportions. Step 5: Prepare Substrate Surface for Plaster Application. Step 6: Apply Base Coat Using Traditional Technique. Step 7: Apply Second Coat and Develop Surface Texture. Step 8: Apply Finish Coat and Complete Surface Treatment.

Your Progress

0 of 8 steps completed

Step-by-Step Instructions

1

Step 1: Source Quality Lime and Prepare Lime Putty

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Obtain high-quality lime and prepare lime putty through proper slaking process for optimal plaster performance. Example: Source natural hydraulic lime NHL 2 or NHL 3.5 from reputable suppliers ensuring proper storage in sealed containers away from moisture, or purchase pre-aged lime putty that has been slaked for minimum 3-6 months for superior plasticity, if making fresh lime putty use quicklime (calcium oxide) and slake with clean water in 3:1 water to lime ratio by volume, add quicklime slowly to water (never water to lime) while stirring continuously with wooden paddle to prevent violent reaction, allow mixture to reach peak temperature during exothermic reaction then continue stirring as temperature drops, strain slaked lime through fine mesh to remove unslaked particles and impurities, store lime putty underwater in sealed container for minimum 2 weeks aging, test lime putty consistency ensuring it has creamy texture without grittiness when properly aged, and verify lime putty fat content by checking for proper plasticity and workability before use in plaster mix.

Discussion for this step

Sign in to comment

Loading comments...

Source Hot Lime Mortar from Traditional Supplier

Fresh hot lime mortar made using traditional methods with quicklime slaked on-site for superior plasticity and workability.

$85
Use Hydraulic Natural Lime NHL 3.5

St. Astier NHL 3.5 natural hydraulic lime providing moderate set strength ideal for interior and protected exterior walls.

Purchase Lime Putty from Specialty Supplier

Aged lime putty slaked for minimum 6 months providing exceptional plasticity for fine finish coats and decorative work.

$45
2

Step 2: Select and Prepare Aggregate Sand

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Choose appropriate sand type and prepare through washing and grading for optimal lime plaster aggregate structure. Example: Select sharp angular sand with grain sizes ranging from 0.1mm to 5mm avoiding rounded beach sand or fine mason sand that lacks proper gradation, test sand cleanliness by shaking sample in jar with water and checking for clay or silt layers that would weaken plaster bond, wash sand thoroughly using clean water to remove clay, organic matter, and salt deposits that could affect lime carbonation, create proper gradation by combining different sand sizes with approximately 60% fine sand (0.1-1mm), 30% medium sand (1-3mm), and 10% coarse sand (3-5mm), dry washed sand completely before mixing to ensure accurate proportions and prevent excess water in plaster mix, sieve sand through appropriate mesh sizes to remove oversized particles that could cause application difficulties, store prepared sand in clean covered containers to prevent contamination with organic matter or foreign materials, and test sand pH ensuring neutral or slightly alkaline conditions compatible with lime chemistry.

Discussion for this step

Sign in to comment

Loading comments...

Select River Sand with Proper Gradation

Sharp angular river sand with grain sizes from 0.1mm to 5mm providing ideal aggregate structure for lime plaster.

Use Beach Sand for Lime Plaster

Marine sand with rounded grains and potential salt content affecting lime plaster performance and durability.

3

Step 3: Add Fiber Reinforcement Materials

Mike Johnson: "Pro tip: Make sure to double-check this before moving to the next step..."

Incorporate appropriate natural fiber reinforcement to provide tensile strength and crack resistance in lime plaster. Example: Choose traditional animal hair such as goat, horse, or cow hair for base coat applications, soaking fibers in water for 24 hours before use to ensure proper integration, cut long fibers to 10-15mm lengths using sharp shears to prevent tangling during mixing while maintaining optimal reinforcement length, alternatively use chopped straw, hemp fibers, or sisal cut to appropriate lengths for different plaster coat requirements, add fiber reinforcement at rate of 2-4% by volume of total mix depending on plaster coat and exposure conditions, distribute fibers evenly through dry sand before adding lime to prevent clumping and ensure uniform reinforcement, check fiber content by visual inspection ensuring even distribution without bunching or gaps in coverage, avoid synthetic fibers which can be incompatible with lime chemistry and traditional building methods, and prepare additional fiber material as needed for different coat applications with base coat requiring most reinforcement.

Discussion for this step

Sign in to comment

Loading comments...

Add Goat Hair Fiber Reinforcement

Traditional goat hair fibers providing excellent tensile strength and crack resistance in lime plaster base coats.

$35
Use Chopped Straw for Reinforcement

Wheat or barley straw chopped to 1-2 inch lengths providing affordable fiber reinforcement for base coat plaster.

4

Step 4: Mix Lime Plaster in Proper Proportions

Combine lime putty, sand, and fiber reinforcement in traditional proportions using proper mixing techniques for optimal plaster consistency. Example: Use traditional lime to sand ratio of 1:2.5 for base coat, 1:2 for second coat, and 1:1.5 for finish coat by volume, measure materials accurately using consistent measuring containers to ensure repeatable mix quality, combine dry ingredients first including sand and chopped fiber reinforcement mixing thoroughly before adding lime, add lime putty gradually while mixing to achieve proper consistency without overwatering, mix by hand using traditional wooden paddle or hoe in mixing trough to maintain lime putty structure, achieve proper consistency where plaster holds together when squeezed but spreads easily without sticking excessively to tools, add clean water sparingly only if needed to adjust workability without making mix too wet, test plaster consistency by applying small sample to practice surface checking for proper adhesion and workability, mix only quantity that can be used within working time (typically 2-4 hours depending on conditions), and maintain consistent color and texture throughout mixing process for uniform final appearance.

Discussion for this step

Sign in to comment

Loading comments...

Standard Aluminum Plastering Tools

Modern aluminum hawk and steel trowels designed for general plastering work with lighter weight construction.

5

Step 5: Prepare Substrate Surface for Plaster Application

Properly prepare wall substrate ensuring optimal conditions for lime plaster adhesion and long-term performance. Example: Clean substrate surface removing all loose material, dust, paint, wallpaper, or previous plaster using wire brushes and scrapers, dampen substrate with clean water using spray bottle to prevent rapid moisture absorption from lime plaster during application, check substrate porosity and adjust dampening accordingly with porous surfaces requiring more water and dense surfaces less, create mechanical key on smooth surfaces by light scarification or application of bonding agent compatible with lime, ensure substrate temperature between 5-25°C (40-75°F) for proper lime carbonation during curing process, protect prepared surface from direct sunlight, wind, and freezing conditions that could affect plaster adhesion, check substrate alignment and plumb using level and straightedge marking high and low spots for correction, apply lime water (limewash) to substrate if additional bonding assistance needed especially on smooth or previously painted surfaces, and verify substrate stability ensuring no movement or vibration that could crack fresh plaster during application and curing.

Discussion for this step

Sign in to comment

Loading comments...

6

Step 6: Apply Base Coat Using Traditional Technique

Apply first coat of lime plaster using proper technique to create strong foundation for subsequent coats. Example: Load hawk with appropriate amount of plaster using trowel and maintain consistent working pace to prevent material drying, apply plaster to substrate using firm pressure with trowel held at 30-45 degree angle ensuring good contact and adhesion, work from bottom to top in manageable sections approximately 1 meter wide maintaining wet edge between sections, achieve base coat thickness of 10-15mm depending on substrate irregularities and overall build-up requirements, create rough texture in base coat using cross-hatching or stippling to provide mechanical key for subsequent coats, compress plaster surface using trowel pressure to consolidate material and eliminate air pockets, maintain consistent moisture in applied plaster using fine mist spray preventing rapid surface drying, work plaster surface with wooden float in circular motions to achieve uniform texture and density, trim excess material from edges and corners ensuring clean transitions, and score surface lightly with sharp tool if additional mechanical key needed for next coat application.

Discussion for this step

Sign in to comment

Loading comments...

7

Step 7: Apply Second Coat and Develop Surface Texture

Apply intermediate coat of lime plaster building surface to near final thickness while developing desired texture. Example: Wait 24-48 hours for base coat to achieve initial set while maintaining surface moisture through light misting, prepare second coat mix with slightly higher lime content (1:2 lime to sand ratio) for improved workability and finishing characteristics, dampen base coat surface evenly without oversaturating to ensure proper adhesion of second coat, apply second coat in 6-8mm thickness using consistent technique and maintaining uniform build-up across entire surface, use wooden float to compress and smooth surface while plaster remains workable, develop surface texture using appropriate tools such as wooden float for smooth finish or natural bristle brushes for stippled texture, work surface in sections maintaining wet edge and consistent pressure to avoid tool marks or surface irregularities, check surface alignment using straightedge and correct any significant variations while plaster remains workable, create uniform color and appearance by consistent application technique and timing of finishing operations, and protect applied coat from rapid drying using fine mist spray and provide adequate curing time before final coat application.

Discussion for this step

Sign in to comment

Loading comments...

Spray Bottle Misting System

Fine mist spray bottles for keeping lime plaster workable during application and preventing rapid drying.

8

Step 8: Apply Finish Coat and Complete Surface Treatment

Apply final thin coat of lime plaster achieving desired surface finish and completing traditional three-coat lime plaster system. Example: Prepare finish coat with highest lime content (1:1.5 lime to sand ratio) using finest sand gradation for smooth application and superior finish quality, apply final coat in thin layer 3-5mm thickness using steel trowel with light pressure to achieve smooth dense surface, work surface with trowel in overlapping strokes maintaining consistent pressure and angle to eliminate tool marks, polish surface when plaster reaches proper consistency (leather hard) using clean trowel with light pressure in long smooth strokes, create final texture using appropriate technique such as trowel polishing for smooth finish or sponge float for textured appearance, maintain surface moisture during finishing operations preventing rapid surface drying that causes cracking or poor finish quality, complete all finishing operations while plaster remains workable typically within 2-3 hours of application, protect finished surface from direct sunlight, wind, and temperature extremes during critical carbonation period, apply final mist spray if needed to maintain proper curing moisture without overwetting finished surface, and allow minimum 7-14 days curing time before applying any decorative treatments or limewash finishes.

Discussion for this step

Sign in to comment

Loading comments...

Traditional Wooden Hawk and Trowel Set

Handcrafted wooden hawk with steel trowel specifically designed for lime plaster application and finishing work.

$125
Natural Bristle Brushes for Texturing

Horsehair and hog bristle brushes for creating traditional lime plaster textures and stipple finishes.

Watch Traditional Lime Plastering Documentary

Comprehensive video showing master craftsmen demonstrating traditional three-coat lime plaster application techniques.