How to Install Subfloor

6 steps 30 min Intermediate

Learn how to install subfloor with our detailed step-by-step guide. Follow our easy instructions to get it done right.

Share:

Your Progress

0 of 6 steps completed

Step-by-Step Instructions

1

Step 1: Inspect and Clean Joists

Check that joists are level, dry, and in good condition - repair as needed.

Discussion for this step

Sign in to comment

Loading comments...

2

Step 2: Snap Chalk Lines for Layout

Mark joist centers on rim joists, snap chalk lines across joists for panel placement.

Discussion for this step

Sign in to comment

Loading comments...

Chalk Line

Chalk line tool for marking joist layout

$14.99
3

Step 3: Apply Construction Adhesive

Run bead of subfloor adhesive along each joist before laying panels.

Discussion for this step

Sign in to comment

Loading comments...

Subfloor Adhesive

Construction adhesive for bonding subfloor (tube)

$12.99
4

Step 4: Install Subfloor Panels

Lay 3/4-inch tongue-and-groove plywood or OSB perpendicular to joists, stagger seams.

Discussion for this step

Sign in to comment

Loading comments...

Tongue-and-Groove OSB

Subfloor panels for floor decking (4x8 sheet)

$34.99
5

Step 5: Fasten Panels to Joists

Screw panels every 6 inches at edges, 8 inches in field - use subfloor screws.

Discussion for this step

Sign in to comment

Loading comments...

Subfloor Screws

Coated screws for securing subfloor (5-lb box)

$24.99
6

Step 6: Fill Gaps and Sand High Spots

Fill panel gaps with wood filler if needed, sand any high edges for smooth surface.

Discussion for this step

Sign in to comment

Loading comments...

Floor Sander Rental

Belt sander for smoothing subfloor (per day)

$45