Process published — nice work
What you do next determines whether this becomes real training. Pick one:
Your Progress
0 of 6 steps completedStep-by-Step Instructions
1 Step 1: Mark Driveway Layout
Step 1: Mark Driveway Layout
Stake out driveway path, typically 10-12 feet wide for single lane, 20-24 for double.
Marking Paint
Spray paint for marking driveway boundaries
2 Step 2: Excavate Driveway Area
Step 2: Excavate Driveway Area
Remove topsoil and dig down 8-12 inches for gravel layers.
Skid Steer Rental
Equipment for excavating driveway (per day)
3 Step 3: Install Base Layer
Step 3: Install Base Layer
Spread 4-6 inches of large crushed stone (3-4 inch), compact thoroughly.
Base Stone
Large crushed stone for driveway base (per ton)
Plate Compactor Rental
Compactor for packing gravel (per day)
4 Step 4: Add Middle Layer
Step 4: Add Middle Layer
Spread 3-4 inches of medium gravel (1-2 inch), compact and grade for drainage.
Medium Gravel
Mid-size gravel for driveway middle layer (per ton)
5 Step 5: Install Top Surface Layer
Step 5: Install Top Surface Layer
Spread 2-3 inches of pea gravel or crushed stone (3/4 inch), rake smooth.
Pea Gravel
Fine gravel for driveway surface (per ton)
Landscape Rake
Wide rake for spreading and leveling gravel
6 Step 6: Install Edging
Step 6: Install Edging
Line driveway edges with timber, stone, or plastic edging to contain gravel.
Landscape Edging
Plastic or metal edging for driveway (20 feet)
Want to create your own processes?
Document your business workflows, train your team, and stop repeating yourself. Free to start.