Your Progress
0 of 6 steps completedStep-by-Step Instructions
1 Step 1: Acclimate Wood and Prepare Subfloor
Step 1: Acclimate Wood and Prepare Subfloor
Store hardwood in room for 3-7 days, ensure subfloor is clean, dry, level.
Moisture Meter
Tool for testing subfloor and wood moisture levels
2 Step 2: Install Underlayment
Step 2: Install Underlayment
Roll out moisture barrier or foam underlayment, staple or tape seams.
Hardwood Floor Underlayment
Foam or felt underlayment for hardwood (100 sq ft)
3 Step 3: Plan Layout and First Row
Step 3: Plan Layout and First Row
Snap chalk line parallel to longest wall, plan to start with groove side to wall.
Spacers
Expansion gap spacers for hardwood installation (pack)
4 Step 4: Face-Nail First Row
Step 4: Face-Nail First Row
Install first row with tongue out, face-nail near wall (covered by baseboard later).
Solid Hardwood Flooring
Red oak or maple hardwood boards (per sq ft)
5 Step 5: Blind-Nail Subsequent Rows
Step 5: Blind-Nail Subsequent Rows
Use flooring nailer to nail through tongue at 45-degree angle, stagger end joints 6+ inches.
Flooring Nailer Rental
Pneumatic nailer for hardwood installation (per day)
Flooring Cleats
Nails/staples for flooring nailer (box)
6 Step 6: Install Last Rows and Trim
Step 6: Install Last Rows and Trim
Rip final row to width, face-nail, install baseboards and transitions to cover gaps.
Pull Bar
Tool for tightening last rows of hardwood
Want to create your own processes?
Document your business workflows, train your team, and stop repeating yourself. Free to start.